Thanks, Beac.
How long from site cut to slab? I was told that SM would call today but no surprise that he didn't
Metro 32 KDRB Bayside Melbourne
viewtopic.php?f=31&t=84012
Browse Forums Building A New House Re: Metro 32 KDRB Bayside Melbourne 142Mar 07, 2017 8:01 pm Build thread: viewtopic.php?f=31&t=85381#p1630392 Re: Metro 32 KDRB Bayside Melbourne 143Mar 07, 2017 8:01 pm JLH222 beac_faith Congrats JLH! You'll be having a slab party in no time Thanks, Beac. How long from site cut to slab? I was told that SM would call today but no surprise that he didn't Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Ours took about 5 working days. Our SM didn't call us at all. Hubby was the one who called him first, weeks after site start. Re: Metro 32 KDRB Bayside Melbourne 144Mar 07, 2017 8:32 pm beac_faith JLH222 beac_faith Congrats JLH! You'll be having a slab party in no time Thanks, Beac. How long from site cut to slab? I was told that SM would call today but no surprise that he didn't Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Ours took about 5 working days. Our SM didn't call us at all. Hubby was the one who called him first, weeks after site start. Yep, I figured that might be the case and we'll have to call him. We are having private inspections done so SM needs to let us know prior to slab pour so that Darbecca can inspect. Argh! I can see this is going to be painful, lol. Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Re: Metro 32 KDRB Bayside Melbourne 145Mar 07, 2017 8:53 pm JLH222 beac_faith JLH222 [quote="beac_faith"]Congrats JLH! You'll be having a slab party in no time Thanks, Beac. How long from site cut to slab? I was told that SM would call today but no surprise that he didn't Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Ours took about 5 working days. Our SM didn't call us at all. Hubby was the one who called him first, weeks after site start. Yep, I figured that might be the case and we'll have to call him. We are having private inspections done so SM needs to let us know prior to slab pour so that Darbecca can inspect. Argh! I can see this is going to be painful, lol. Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012[/quote] We never met our Slab SM @ all Because we had Inspections we contacted darbecca with contacts of SM so they emailed him to inform them before pour. He pretty much contacted darbecca himself they did inspection, things were rectified onsite and it was over. Lol However our next SM assigned we've met Re: Metro 32 KDRB Bayside Melbourne 146Mar 07, 2017 9:16 pm Emmz70 JLH222 beac_faith [quote="JLH222"][quote="beac_faith"]Congrats JLH! You'll be having a slab party in no time Thanks, Beac. How long from site cut to slab? I was told that SM would call today but no surprise that he didn't Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Ours took about 5 working days. Our SM didn't call us at all. Hubby was the one who called him first, weeks after site start. Yep, I figured that might be the case and we'll have to call him. We are having private inspections done so SM needs to let us know prior to slab pour so that Darbecca can inspect. Argh! I can see this is going to be painful, lol. Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012[/quote] We never met our Slab SM @ all Because we had Inspections we contacted darbecca with contacts of SM so they emailed him to inform them before pour. He pretty much contacted darbecca himself they did inspection, things were rectified onsite and it was over. Lol However our next SM assigned we've met [/quote] Ok cool. Thanks, Emmz. I was given the SM's mobile, so I gave that to darbecca but they said to get back in contact with them to advise of the slab pour date. It would be so much easier if SM & Darbecca spoke directly. I think I'll sort that out tomorrow. Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Re: Metro 32 KDRB Bayside Melbourne 147Mar 07, 2017 9:28 pm JLH222 Emmz70 JLH222 [quote="beac_faith"][quote="JLH222"][quote="beac_faith"]Congrats JLH! You'll be having a slab party in no time Thanks, Beac. How long from site cut to slab? I was told that SM would call today but no surprise that he didn't Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Ours took about 5 working days. Our SM didn't call us at all. Hubby was the one who called him first, weeks after site start. Yep, I figured that might be the case and we'll have to call him. We are having private inspections done so SM needs to let us know prior to slab pour so that Darbecca can inspect. Argh! I can see this is going to be painful, lol. Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012[/quote] We never met our Slab SM @ all Because we had Inspections we contacted darbecca with contacts of SM so they emailed him to inform them before pour. He pretty much contacted darbecca himself they did inspection, things were rectified onsite and it was over. Lol However our next SM assigned we've met [/quote] Ok cool. Thanks, Emmz. I was given the SM's mobile, so I gave that to darbecca but they said to get back in contact with them to advise of the slab pour date. It would be so much easier if SM & Darbecca spoke directly. I think I'll sort that out tomorrow. Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012[/quote] Email your building coordinator and include your SM and darbecca. Letting them know that you'd like to be contacted before slab pour, because you'd like an inspection done. I did this and SM took up the task of contacting them directly, darbecca then rang me to say SM will be dealing with them directly so that was a hassle free first inspection. Hope you have a hassle free one as well Re: Metro 32 KDRB Bayside Melbourne 148Mar 08, 2017 5:48 am Emmz70 JLH222 Emmz70 [quote="JLH222"][quote="beac_faith"][quote="JLH222"][quote="beac_faith"]Congrats JLH! You'll be having a slab party in no time Thanks, Beac. How long from site cut to slab? I was told that SM would call today but no surprise that he didn't Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Ours took about 5 working days. Our SM didn't call us at all. Hubby was the one who called him first, weeks after site start. Yep, I figured that might be the case and we'll have to call him. We are having private inspections done so SM needs to let us know prior to slab pour so that Darbecca can inspect. Argh! I can see this is going to be painful, lol. Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012[/quote] We never met our Slab SM @ all Because we had Inspections we contacted darbecca with contacts of SM so they emailed him to inform them before pour. He pretty much contacted darbecca himself they did inspection, things were rectified onsite and it was over. Lol However our next SM assigned we've met [/quote] Ok cool. Thanks, Emmz. I was given the SM's mobile, so I gave that to darbecca but they said to get back in contact with them to advise of the slab pour date. It would be so much easier if SM & Darbecca spoke directly. I think I'll sort that out tomorrow. Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012[/quote] Email your building coordinator and include your SM and darbecca. Letting them know that you'd like to be contacted before slab pour, because you'd like an inspection done. I did this and SM took up the task of contacting them directly, darbecca then rang me to say SM will be dealing with them directly so that was a hassle free first inspection. Hope you have a hassle free one as well [/quote] Thanks, Emmz. Sounds like a plan Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Re: Metro 32 KDRB Bayside Melbourne 149Mar 08, 2017 9:41 pm Spoke to stage 1 SM today. Sounds like a nice guy. We should have slab pour on 28/3 and frame delivery 31/3 Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Re: Metro 32 KDRB Bayside Melbourne 150Mar 15, 2017 5:00 pm JLH222 Spoke to stage 1 SM today. Sounds like a nice guy. We should have slab pour on 28/3 and frame delivery 31/3 Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Can't wait to see more progress Does your SM change at every stage? Re: Metro 32 KDRB Bayside Melbourne 151Mar 15, 2017 6:54 pm beac_faith JLH222 Spoke to stage 1 SM today. Sounds like a nice guy. We should have slab pour on 28/3 and frame delivery 31/3 Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Can't wait to see more progress Does your SM change at every stage? I'm just about to post a pic of our piers...slowly slowly so far, lol. Yes, we have a site manager for slab and then a site manager for the rest of the build. Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Re: Metro 32 KDRB Bayside Melbourne 152Mar 15, 2017 6:58 pm Went past the block today and found these beauties Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ On track for slab pour on the 28th Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Re: Metro 32 KDRB Bayside Melbourne 153Mar 15, 2017 7:01 pm JLH222 Went past the block today and found these beauties Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ On track for slab pour on the 28th Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Yay PVC next Re: Metro 32 KDRB Bayside Melbourne 155Mar 15, 2017 7:54 pm JLH222 Went past the block today and found these beauties Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ On track for slab pour on the 28th Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Congrats JLH !! Re: Metro 32 KDRB Bayside Melbourne 156Mar 15, 2017 8:45 pm Thanks, guys Looking forward to seeing the plumbing and electrical pipes laid next Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Re: Metro 32 KDRB Bayside Melbourne 157Mar 18, 2017 4:14 pm We have some trenches and pipes Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Re: Metro 32 KDRB Bayside Melbourne 158Mar 18, 2017 5:19 pm JLH222 We have some trenches and pipes Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Congrats. How long did it take you to get here from when you handed it over to M to do the soil testing etc? Re: Metro 32 KDRB Bayside Melbourne 159Mar 18, 2017 6:31 pm Renman JLH222 We have some trenches and pipes Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Congrats. How long did it take you to get here from when you handed it over to M to do the soil testing etc? We handed over mid December....not a quick process Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Re: Metro 32 KDRB Bayside Melbourne 160Mar 18, 2017 6:45 pm JLH222 Renman JLH222 We have some trenches and pipes Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Congrats. How long did it take you to get here from when you handed it over to M to do the soil testing etc? We handed over mid December....not a quick process Metro 32 KDRB Bayside Melbourne viewtopic.php?f=31&t=84012 Oh no. I was hoping for 6-7 weeks. I handed ours over this week and was hoping that we wouldn't be doing the frames in winter, but this might mean we have to now. Keen to hear from people in the area who have got KDRB done on whom they got the build from? Looking for recommendations. Thanks 0 21770 😃 will do an exclusive one for Simeon.. COVID back at home.. kept it simple & we moved in.. & yesterday was the first day at our new home.. Few more bits to go -… 4 25600 Hi, First of all, thank you to this community for sharing your thoughts and opinions. We are in early days of our pre-contract stage for Metricon Doulton and we are… 0 12795 |