Browse Forums Building A New House Re: Who is building with Beechwood 13985Dec 02, 2016 4:31 pm 20/11/15 - Settled land 06/11/15 - Request 1st tender BH 21/04/16 - Colour Selections and Contracts Signed 31/05/16 - Commencement Letter 24/06.16 - Started work onsite - cut and benching begun Re: Who is building with Beechwood 13986Dec 02, 2016 4:41 pm Moscato5 Balk I've just had confirmation that carpets and aircon vents were done today. It seems we have some movement! Can't have much left now! Great news Balk. We did our daily driveby and what do you know, no painters. SS was there though. He spends more time there then the trades. He honestly is a great guy. He was there cleaning up. He is trying to coax the painters into working the weekend to make a start. If not, monday. Things have been pushed back again because of no available painters. Talk about touch and go. Carpet now booked for 20 or 21. BH shuts down 22. don't like our chances. However, on the plus side, we received our final invoice today in order to try get the bank onside. Catch here too though - according to bank manager they won't do valuation till carpet is in. But at least they will have the paperwork they need except occupation certificate which is still in the making . There isn't much time left before shutdown but stay positive. I know for a fact that beechwood don't want to be holding onto your job during Christmas as if anyone does any damage it costs them as its still in their possession. Plus they are always looking to get paid a hahaha Re: Who is building with Beechwood 13987Dec 02, 2016 6:28 pm Balk I've just had confirmation that carpets and aircon vents were done today. It seems we have some movement! Can't have much left now! Awesome! Our carpets got done today too plus we have all the door furniture on. Do you know how long roughly it takes for air con to get done? We have a week left and still no vents or concrete pad. Building Beechwood Bordeaux Four in Newcastle area Re: Who is building with Beechwood 13988Dec 02, 2016 6:31 pm nataliea Balk I've just had confirmation that carpets and aircon vents were done today. It seems we have some movement! Can't have much left now! Awesome! Our carpets got done today too plus we have all the door furniture on. Do you know how long roughly it takes for air con to get done? We have a week left and still no vents or concrete pad. My AC (internal) was installed in one day and the concrete for the stand was done during the slab. I am told the external AC unit is installed after hand over. Unsure why exactly Re: Who is building with Beechwood 13989Dec 03, 2016 5:35 am Balk nataliea Balk I've just had confirmation that carpets and aircon vents were done today. It seems we have some movement! Can't have much left now! Awesome! Our carpets got done today too plus we have all the door furniture on. Do you know how long roughly it takes for air con to get done? We have a week left and still no vents or concrete pad. My AC (internal) was installed in one day and the concrete for the stand was done during the slab. I am told the external AC unit is installed after hand over. Unsure why exactly I've been told that there's a shortage of Ducting units & that's why they are not being installed during the roof/walls being installed & that they are planning on having them all done at the same time by the company. It will be one of the last things done before shut down. Lakeview 27 - Beechwood 12/15 Deposit 7/16 Council/Certifier 8/16 Colour Appointment Re: Who is building with Beechwood 13991Dec 03, 2016 12:03 pm braddy_ Our commencement letter says the build will start by 6 Dec.. but we have not heard anything from anyone yet. Should we be told who our site supervisor is by now? We received a letter with our SS names and office contact. If you don't get something this week chase them up 20/11/15 - Settled land 06/11/15 - Request 1st tender BH 21/04/16 - Colour Selections and Contracts Signed 31/05/16 - Commencement Letter 24/06.16 - Started work onsite - cut and benching begun Re: Who is building with Beechwood 13992Dec 03, 2016 12:10 pm braddy_ Our commencement letter says the build will start by 6 Dec.. but we have not heard anything from anyone yet. Should we be told who our site supervisor is by now? No not yet. You wont be assigned one until after the slab is built. Thats what we got told. We are ready for the frame and haven't got one yet. Buildingabetterhome.blogspot.com.au Land deposit - Oct 14 Deposit - Jan 16 Land registered - June 16 Settlement - July 16 Colour selection and approval -Sept 16 Slab- Nov 16 Frame - Dec 16 Re: Who is building with Beechwood 13993Dec 03, 2016 5:26 pm Grace33 braddy_ Our commencement letter says the build will start by 6 Dec.. but we have not heard anything from anyone yet. Should we be told who our site supervisor is by now? No not yet. You wont be assigned one until after the slab is built. Thats what we got told. We are ready for the frame and haven't got one yet. We had 1 for slab, then 1 from frames. 20/11/15 - Settled land 06/11/15 - Request 1st tender BH 21/04/16 - Colour Selections and Contracts Signed 31/05/16 - Commencement Letter 24/06.16 - Started work onsite - cut and benching begun Re: Who is building with Beechwood 13994Dec 04, 2016 9:39 am Moscato5 Grace33 braddy_ Our commencement letter says the build will start by 6 Dec.. but we have not heard anything from anyone yet. Should we be told who our site supervisor is by now? No not yet. You wont be assigned one until after the slab is built. Thats what we got told. We are ready for the frame and haven't got one yet. We had 1 for slab, then 1 from frames. I had the same experience. I had a concrete supervisor and a build supervisor. The concrete supervisor was in charge of forming the slab, piering and pouring of the slab. Once this was done I was introduced to my site supervisor who has been amazing up until recently when I was advised he had to take leave. I haven't met my new supervisor and that has been 2 weeks ago. I'm hoping the new supervisor is just as good as the last one. Re: Who is building with Beechwood 13995Dec 05, 2016 5:11 pm braddy_ Our commencement letter says the build will start by 6 Dec.. but we have not heard anything from anyone yet. Should we be told who our site supervisor is by now? What area are you building in? We got our commencement letter which was around the 19th dec but looks likethey might start early as long as they can get the whole slab down and poured before the 22nd so it can cure over the shut down when they close down. Looks promising had rough fill delivered today for access and they should be starting the cut / Fill tomorrow. Re: Who is building with Beechwood 13996Dec 05, 2016 7:30 pm Painting started today. Heres hoping for a miracle with no more hiccups. But still want a good job done of course. 20/11/15 - Settled land 06/11/15 - Request 1st tender BH 21/04/16 - Colour Selections and Contracts Signed 31/05/16 - Commencement Letter 24/06.16 - Started work onsite - cut and benching begun Re: Who is building with Beechwood 13997Dec 05, 2016 7:33 pm Great to hear Moscato5! Buildingabetterhome.blogspot.com.au Land deposit - Oct 14 Deposit - Jan 16 Land registered - June 16 Settlement - July 16 Colour selection and approval -Sept 16 Slab- Nov 16 Frame - Dec 16 Re: Who is building with Beechwood 13998Dec 05, 2016 10:17 pm Well, still going through tender etc. Hopefully going to council before they close down, think the council works a bit longer, but not holding breath. Can I ask, what downlights are everyone using? Is it from your electrical fitout, or after? Any particular type better or worse? Lastly, is there a limit as to colour of moroka? We are having monument roof, silver bricks & would like something a bit different for the moroka colour. Mainly to break up the neutrality of the rest of the house. Maybe something warm? Not sure Any ideas? Cheers Mark Re: Who is building with Beechwood 13999Dec 05, 2016 10:26 pm jonesyGT Well, still going through tender etc. Hopefully going to council before they close down, think the council works a bit longer, but not holding breath. Can I ask, what downlights are everyone using? Is it from your electrical fitout, or after? Any particular type better or worse? Lastly, is there a limit as to colour of moroka? We are having monument roof, silver bricks & would like something a bit different for the moroka colour. Mainly to break up the neutrality of the rest of the house. Maybe something warm? Not sure Any ideas? Cheers Mark We're doing a maroka as well. Coal tile roof (dark grey), Blackburn bricks, basalt gutter and down pipes, Surfmist fascia and maroka. We are building a Lexia Slim with Vista 1 with Maroka facade. buildingourhumblehome.blogspot.com.au Re: Who is building with Beechwood 14000Dec 05, 2016 10:27 pm tapasr_Lexia4 jonesyGT Well, still going through tender etc. Hopefully going to council before they close down, think the council works a bit longer, but not holding breath. Can I ask, what downlights are everyone using? Is it from your electrical fitout, or after? Any particular type better or worse? Lastly, is there a limit as to colour of moroka? We are having monument roof, silver bricks & would like something a bit different for the moroka colour. Mainly to break up the neutrality of the rest of the house. Maybe something warm? Not sure Any ideas? Cheers Mark We're doing a maroka as well. Coal tile roof (dark grey), Blackburn bricks, basalt gutter and down pipes, Surfmist fascia and maroka. We are building a Lexia Slim with Vista 1 with Maroka facade. Sorry it's blackbutt bricks (silly auto correct) buildingourhumblehome.blogspot.com.au I do enjoy the drama:-D In his latest two videos he has started bringing security guards to site, I am waiting for the punch on to begin lol 6 46192 Hey guys building a new place through a volume builder and just wondering if i should complain to the site supervisor as we just had plasterboard installed. Looks like… 0 11551 |