Browse Forums General Discussion Re: Excessive site costs? 102Jun 12, 2016 8:09 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Excessive site costs? 103Jun 12, 2016 9:48 am Building Services Engineer Renovating our 1960's modernist home in Brisbane https://forum.homeone.com.au/viewtopic.php?f=53&t=82091 Re: Excessive site costs? 107Jun 13, 2016 9:36 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Excessive site costs? 111Jul 22, 2016 3:00 pm Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Excessive site costs? 113Jul 23, 2016 7:42 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Excessive site costs? 116Aug 01, 2016 4:58 pm Building Services Engineer Renovating our 1960's modernist home in Brisbane https://forum.homeone.com.au/viewtopic.php?f=53&t=82091 Re: Excessive site costs? 117Aug 02, 2016 9:18 pm Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Excessive site costs? 119Aug 03, 2016 10:37 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Excessive site costs? 120Aug 23, 2016 4:03 pm Just receive a pre-contract quote from the builder. Basics are 2000m2 block, 1.8m drop on house site (back to front), S Class soil. Connections (Stormwater, power, water, sewer): $3,000 Over standard allowance due to set back of building. Earthworks to level the site: $2,000 Piering for slab: $4,400 Rock removal: $6,000 (provisional) BAL-19 Requirements: $6,000 (provisional) TOTAL: $21,400 All seems quite reasonable to me and nothing unexpected. No retaining walls included though I'll probably get some done post hand over to tidy up the landscape. I'll be confirming the Rock Removal billing policy. Happy to pay cost plus X% method an request copies of the invoices. Don't want to pay $6k for $2k worth of rock removal. Is anyone building with Mojo and have a recent site cost tender 0 16091 Henley should give you some indication of site costs. Too many variable to give you any reasonable accuracy 1 2046 Looking to tile the facade pillars rather than rendering. Builder is quoting 2500$ laying cost for upto 10msq. The 2 pillars come to be 16msq. So laying costs are 5000$… 0 7928 |