Browse Forums Building A New House Re: Mojo Homes 27Jun 02, 2015 2:35 pm Hello Everyone We are in the beginnings of building a modified oracle, would like to speak to anyone who has built this home or are building one to get some ideas that we may have overlooked. Looking forward to hearing from you Re: Mojo Homes 28Jun 03, 2015 9:05 am We are building in Harrington Grove in Sydney sw. Our land doesn't get registerd about January/February 2016, so we have a bit of time to get everything done to our liking. We are just at the early stages of the process. We are looking at the Sheike Facade, 3 car garage and a few other additions. Anything I should especially mention or take note of, during the tendering process. Re: Mojo Homes 31Jun 03, 2015 10:19 am I would like to see how you put the fifth bedroom downstairs. we added a cabana room with a wir entering a toilet, by extending the alfresco area. Will use it as a games room/man cave extended entertaining area. we had to extend the front main lounge and bedroom 1 as well for Harrington Grove guidlines so made study bigger, also looking at puting a walk through robe behind the bed the main bedroom so increasing closest space. we are starting the tendering process from the estimates now, but will go through that with a fine tooth comb, then go through it again. yes we did get that 40mm stone kitchen promotion and kitchen upgrades. Re: Mojo Homes 32Jun 03, 2015 12:43 pm I really like the design changes you made. Might give mine another look, especially how you located the childerns retreat. How did you find the selection and pricing of electricals etc, at the mojo colour studio. we have not been as yet and we allocated funds for it, but I am a little worried we did not budget enough, or I will have to do most after handover. how did you decide on some changes based on no display home to look at that has been a bit of a worry for me. thank you for your replies. Re: Mojo Homes 33Jun 03, 2015 2:17 pm I agree with you any alterations will be done downstairs I can sort out the upstairs later. I worry more about structural items in the build the rest can be done later. Can you just pop up or did you need to make a booking. Isn't it leaving things late with pour in August and it is already June, how long did they give you for the build, the estimate time for completion they gave us from when land is registerd to move it I thought was optimistic. Reading what others have experienced. I worry more of the fact there was no display home the have a look at either. Reminds me I also liked your void area in the entrance. Re: Mojo Homes 34Jun 06, 2015 8:20 am Hi All Next appointment for us will be 1st July for approval of plans, then colour selections. We asked about a timeframe for the first time in our last meeting (we're not in a massive hurry as we are doing a knock-down rebuild), and were told we were now about three months from beginning construction, and about six months from completion. It will be interesting to see if the timeframe changes moving forward. Re: Mojo Homes 39Jun 23, 2015 6:52 pm That sounds amazing! Love your choices for your kitchen! With your bathroom tiles is there anywhere we can look at their range before our colour appointment? Which supplier do they use? That's one of my concerns at the moment, not being able to look at their tile choice properly before the actual appointment, since the colour walk through is so quick... Is anyone building with Mojo and have a recent site cost tender 0 16114 Hi all, We are considering Enigma 46 from Mojo Homes in Gables, NSW. Has anyone built with Mojo and any pointers and feedback. Also, if anyone has built similar design… 0 13351 Hi, We are looking for a builder that can build a small home (smaller length) on a sloping site. We came across Mojo's Zephyr design 10.6 m wide and 11.5 m length. Does… 0 23226 |