Browse Forums Building A New House Re: Village Square Edmondson Park Stage 16 269Aug 17, 2016 9:53 pm Hey all Just going over some paperwork today and it says that registration for the land is scheduled for late September early October. Dose this mean building can start son after this Re: Village Square Edmondson Park Stage 16 270Aug 17, 2016 10:15 pm Nemini Hi All Just last weekend i placed a deposit on a block in Sammarah Road, block 1671 to be exact. I went for a house and land package with Casaview homes as they seem to have good reviews and also include nearly everything. I have gone with and elite 33 design ( i noticed one other member on here is building the same, hope were not too close together) Casaview also seemed to offer most site cost that i have been told to look out for National Broadband Network (NBN) Setup works – basic Standard BASIX requirements incl recycled water connection Gas pack inc. connection. Site costs – incl all piering to slab, site classification testing, landscape plan, all dirt removal & the following if required only by local authorities - Drop edge beams, rock excavation, H1 slab upgrade / salinity treatment to slab / sewer peg out and or Bal12.5 Bushfire construction. Is there any others i should look out for?? I know i still need to do landscaping and things like that and have allowed for this in my budget. With the house i am also looking to add a few extras. Down-lights throughout 26 total comes with 6 Floor to ceiling tiles main and en-suite 2 recesses for TV's data point in each room total of 8 tv point 6 comes with 2 extra 4 power points anyone know what sort of cost i should allow for my extras. I had them include the premium stuff which are things like better doors, ducted AC, 12 high tiles, appliances 2.7 ceiling Anyway i am very excited and look forward to maybe seeing you all around the area in 12 months or so. Neal Hi Neal, We're getting quotes on variations atm and this is what we were quoted. 2.7 Floor to ceiling for ensuite and main - $3k for both TV points - $105 each Power points - $55 each Data Points - We have 4 extra points plus cabling (Cat6) and it has come in at $900, I still need to confirm this is what we want though. We have wired NBN to Bed 4, then out to living and main. There is also the NBN Hills home hub which was about $1500 with 4 data points. Re: Village Square Edmondson Park Stage 16 276Aug 24, 2016 3:28 pm Crownland has advised : We expect registration to be in October 2016. The plans still need to be submitted to Council and LPI. Re: Village Square Edmondson Park Stage 16 278Aug 24, 2016 4:01 pm ss2211 That probably means November if factor in any delays And which means house build may not start till March 2017 (including downtime for Christmas). No idea about the driveway question, but your price for a house that size including landscaping seems very good! 1 6161 Not unless you have managed to put it as a special condition into the contract somehow. 1 6155 |