Browse Forums Pools & Spas 1 Jun 21, 2016 12:22 pm We would like to upgrade our pool surrounds after moving our pump and replumbing the pool.
So far we know we want the following: to have the pool surrounds level with the coping (no step off) glass (frameless or semi frameless) fence along the border facing the house. redo gazebo in the same spot but with decking floor. What we don't know is whether to do: honed concrete and throw a whole new slab that comes level with the existing pebblecrete coping? or pave the surrounds either up to the existing cope or try and put a new coping tile over the existing pebbelcrete edge? -the problem ➙ the pool is freeform and is by no means level and has multiple rock features to contend with. -what we don't want is to compromise the integrity of the pool by trying to mess with/redo the coping (because the pool is generally in very good condition) We just not sure what is possible with this type of edge/coping. We are more than happy to stick with the existing coping if we can find something that will complement it i.e. concrete/pavers etc. Any design advise would be most welcome! Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Upgrade options - old 'rolled edge' pebble crete pool 2Jun 21, 2016 1:35 pm What we did was remove the existing slab, remove and replace existing coping, and added a new slab with new paving. Ours was not quite as freedom as yours but believe me it was not level nor had any real right angles. In your case I would completely replace the coping at a minimum not go over the top of the existing. Then Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Now Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Sent from an iPhone please excuse the ridiculous spell correcting software. My forum thread is at viewtopic.php?t=74944 Re: Upgrade options - old 'rolled edge' pebble crete pool 3Jul 25, 2016 5:25 pm Hi - I can highly recommend a fencing contractor: http://www.sunlineaustralia.com.au/ But this is in WA, VIC, SA. Where are you located? Hello everyone, After some suggestions and ideas about how to put a concrete path around the drop edge beam area on our new build. We are required to have a concrete path… 0 13348 get them to replace the chipped tiles. It will stick out like a sore thumb overwise. Also tiler will be siliconing the miters rather than grouting. Grouted miters crack… 1 4245 |