Browse Forums Building A New House Re: KDR with Rawson Homes - The Edge 39 MKI (Sydney) "Intern 274Apr 21, 2016 6:06 pm Build thread: viewtopic.php?f=38&t=75302 Re: KDR with Rawson Homes - The Edge 39 MKI (Sydney) "Intern 276Apr 21, 2016 7:13 pm M Y C U S T O M C O R A L B R O N T E 43 ...............Kitchen! 16 Nov 2016 https://forum.homeone.com.au/viewtopic.php?f=31&t=79581 KDR with Rawson Homes - The Edge 39 MKI (Sydney) "Internals" 277May 03, 2016 8:03 pm Exciting day tomorrow. Kitchen! Cabinets delivered this afternoon, so i checked out all the gear. If i thought of it at the time, I'd probably change the drawer runners to blum, but a small issue. Others still in a planning phase should probably check out the cost difference between the standard hettich and blum. Our old kitchen and wardrobes ran on blum drawers, which were smooth and consistent. At this stage, I'm not overly impressed with Hettich runners. Anyway.. Minor rant. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ We have alot of drawers in the kitchen, all handleless with the odd cupboard under the sink or the cooktop. Here is a close up of a drawer, and also one of a small pantry full height run Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Vanities are ready to go as well as the mirror backs. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ The mounting board for the mirrors are pretty chunky. About 30-40mm thick I'd say. Those who have missed my rant on the blog about tiles direct. They quote vanity wall feature tiling as the full wall. Either they don't read plans, or they play dumb knowing full well that there is a massive board mount on the wall as rawson detail this on their plans. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ The plumbers returned to connect the downpipes so it will be interesting to see if it leaks... I'll have to drop in next time it pours. (The stormwater system is a charged line design. This means that the pipes store water as well as the tank) Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Painters also returned to put a first coat on the door frames, window and skirting trims upstairs. Things are back on schedule with tiles getting booked next week. Happy day. using Tapatalk Edge39.my-letter-box.com Re: KDR with Rawson Homes - The Edge 39 MKI (Sydney) "Intern 278May 03, 2016 11:48 pm That's great progress. Its really starting to look like a house now, well it will tomorrow. Not too much left. Wait till the drawers are installed as I'm sure there are adjustments that can be made to make the runners smoother. I remember the display homes drawers being pretty good. I assumed they are the same we are getting. Rawson Edge 39 MKI in Ryde, Sydney Re: KDR with Rawson Homes - The Edge 39 MKI (Sydney) "Intern 279May 04, 2016 10:06 am Looking for Steve! Be sure to post kitchen pics! Wonder what the cost would be to change to Blum... Although the company doing my kitchen are really unwilling to liaise with me anyway so probably too late anyhow C U S T O M. C O R A L. B R O N T E. 43 http://forum.homeone.com.au/viewtopic.php?t=79581 M Y C U S T O M C O R A L B R O N T E 43 ...............Kitchen! 16 Nov 2016 https://forum.homeone.com.au/viewtopic.php?f=31&t=79581 Re: KDR with Rawson Homes - The Edge 39 MKI (Sydney) "Intern 280May 04, 2016 10:09 am The crew are motoring through the installation this morning. All the vanities are mounted and backing boards fixed. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ They are working on the kitchen at the moment. Amazing to see them at work. using Tapatalk Edge39.my-letter-box.com Hi, I am looking into doing a KDR in Melbourne and am contemplating using Kialla Homes. I am looking for feedback on them from others who have built with them. 0 13442 Just started the Build process for Chifley 42 with Rawson homes, will keep you all posted with the Build progress. 0 2451 |