Browse Forums Owner Builder Forum 1 Oct 19, 2018 3:28 pm Just wondering if anyone can help me? I am building in a rural area in East Gippsland Victoria about 100 km from the nearest large town and I was asking around for quotes for a foundation concrete slab. The specs are: - 32 MPA for semi-polished concrete floors - house foundation is a large rectangle 18m x 7.2m = 129.6 square meters - raft slab - soil classification is M - fairly flat block 1 acre, I've talked to some excavators in the area who have excavated a house across the road and they said it was a low problem site - easy access to site from the road I have been receiving quotes between $30,000 to $38,000 including GST which includes site preparation and excavation, formwork, digging edge beams, pouring concrete and finish and a concrete pump. The cost seems to be between $240/m2 to $292/m2. Does anyone know if these costs are reasonable or excessive? Re: How much for a house foundation concrete slab? 2Oct 20, 2018 7:50 am Lorrainey100 welcome to the forum That is a great request for Information (RFI) The only thing missing is a site photo and Floorplan? you might want to start by reading this Slab and Formwork Costs OT Some trades often take advantage of owner builders, here's what to do 1. Detail, Plan and Cost whats involved 2.Have proper Engineering/Construction Drawings, Specifications, etc 3. Compare & evaluate at least 3 written quotes 4. Break down the project , explain Data Visually and hope to negotiate-> aim for a fair price with the preferred subcontractor. 5.Take control of your project More info required Cheers Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: How much for a house foundation concrete slab? 3Oct 20, 2018 1:14 pm Thanks for replying 1. Detail, Plan and Cost whats involved - I provided them with an architectural plan and drawing 2.Have proper Engineering/Construction Drawings, Specifications, etc - I provided them with a structural engineer drawing 3. Compare & evaluate at least 3 written quotes - I've requested at least 5 quotes 4. Break down the project , explain Data Visually and hope to negotiate-> aim for a fair price with the preferred subcontractor. - I think this is my next step - I will be breaking it all down and getting contractors to cost individually. 5.Take control of your project I thought this would be a popular question but I haven't been able to find any similar posts. Perhaps I'm wording my searches wrong? When you have car insurance and the… 0 6981 The concreter will take and reuse. In my case I bought structural LVLs and scraped them back and used them as joists. 1 5842 yep, clearly mark where the infloor heating pipes are before drilling or nailing 1 6350 |