Browse Forums Building A New House 1 Jul 23, 2016 3:42 pm Hi all,
Been on the forums for a few months, getting great info and help from everyone's experiences. So I guess it's only fair to start sharing my journey. We are building a Hampshire 45 with a few modifications. House will end up a bit over 50 in the end. Our timeline so far.... Administration 26 April 2016 - Initial Deposit - $1500 26 June 2016 - Preliminary Contract Signed - $2500 21 July 2016 - Final Contract Signed and 5% Deposit. 22 August 2016 - Electricals and Titles 29 August 2016 - Studio M Selections 06 September 2016 - Existing House removed 09 September 2016 - Initial Studio M Variations received 20 September 2016 - Site Clean up -> Highly recommend: Total Asbestos Removal and Demolition 22 September 2016 - Studio M Selection Variations Signed (After 3 revisions from the initial) 24 September 2016 - CCTV Storm Water Drain Inspection -> Highly recommend: Pipe Hawk CCTV 12 October 2016 - Building Approval Received from Council Construction 04 November 2016 - Official Site Start Date - Site Cut Done. 07 November 2016 - First Meeting with SM on site. 08 November 2016 - Bricks Delivered 12 November 2016 - Retaining Walls Started (Done by me over 2 weekends). 21 November 2016 - Retaining Walls Done 24 November 2016 - Under Slab Work Commenced, pipes etc. 28 November 2016 - Slab Prep Done. Waffle pads, steal mesh and Border. 29 November 2016 - Temp Fencing and Power Pole setup. 30 November 2016 - Slab Pour 08 December 2016 - Frames Delivered 13 December 2016 - Bottom floor frames up. 15 December 2016 - Top floor flooring done. 19 December 2016 - Frames complete. 20 December 2016 - Roof guttering installed. 21 December 2016 - Roof sarking installed. 22 December 2016 - Main Roof tiles laid. 10 January 2017 - Internal Plumbing 11 January 2017 - Delivery of windows and doors 12 January 2017 - Windows installed. 13 January 2017 - Front Door, garage rear and laundry doors installed. 14 January 2017 - Garage and Rear Lower Roof tiles installed. 16 January 2017 - House wrapped with blue stuff. 17 January 2017 - Internal electrical prep. 19 January 2017 - Stacker Doors installed, Gyprock delivered. 20 January 2017 - Insulation installed 21 January 2017 - Bricks started 24 January 2017 - Internal walls started 06 February 2017 - Internal Doors Delivered, Stairs Started 07 February 2017 - Window surroundings and internal doors installation. Electrical work. Stairs Completed. 08 February 2017 - Kitchen and bathroom cabinetry delivered. 09 February 2017 - Kitchen and bathroom cabinetry installed. 13 February 2017 - Top floor skirting complete. (Bottom floor cut and bundled for post hand over install after tiles) 15 February 2017 - Interior painting started. 16 February 2017 - Stone bench tops and sinks/basins installed. 20 February 2017 - Wet area tiling started. 01 March 2017 - Cladding and Eves installed. Also Bathroom accessories delivered. 02 March 2017 - Cladding painted. 03 March 2017 - Bathroom accessories installed. 05 March 2017 - Security sensors, cameras and other data related goodies installed 07 March 2017 - Internal electric fittings installed - light switches, power points etc 08 March 2017 - Facade rendering started. 09 March 2017 - Facade rendering complete. 10 March -> 31 March 2017 - Just touch ups and fixes. 04 April 2017 - PCI (Practical Completion Inspeciton) 08 May 2017 - Handover =D Post Handover 12 May 2017 - Main floor tiling commenced 15 May 2017 - Garage floor epoxy 16 May 2017 - Block retaining walls, driveway and general concreting commenced 22 May 2017 - Main floor tiling complete 29 May 2017 - Concreting and walls complete 02 June 2017 - Timber fence either side installed. 07 June 2017 - Upstairs Carpet installed 14 June 2017 - Furniture and white goods deliveries 16 June 2017 - Curtains installed Primary Residence 24 June 2017 - Moved in =D Final Construction Plans Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Major changes include: Triple garage, with rear roller door and articulation for the 3rd spot Increased outdoor area 2700mm Ground Floor 2550mm Top Floor Various extra bulk heads Top Floor changes to rooms, WIRs, bathroom, toilet locations Power room instead of WIL Delete Bath and have big shower instead Top floor toilet added vanity cuboards and sink Front pivot door 2340x1200 Stacker doors everywhere downstairs in lieu of windows, upgraded and rebated into slab Remove door from WIP 2340mm High Internal/External/Stacker doors Sink added to Pantry Storage Under Stairs Increased Kitchen Island Size 3000x1400 (largest slab with no join) Re: Metricon Liberty - Hampshire 45 QLD 2Jul 23, 2016 5:11 pm dulie Hi all, Been on the forums for a few months, getting great info and help from everyone's experiences. So I guess it's only fair to start sharing my journey. We are building a Hampshire 45 with a few modifications. House will end up a bit over 50 in the end. Our timeline so far.... 26 April 2016 - Initial Deposit - $1500 26 June 2016 - Preliminary Contract Signed - $2500 21 July 2016 - Final Contract Signed and 5% Deposit. Below is our plans as of contract signing, almost correct. Just a few more adjustments for them to make. Major changes include: Triple garage, with rear roller door and articulation for the 3rd spot - $21k (was only $17k without the articulation ) Increased outdoor area - $10k (not right yet, we are going bigger so will cost more) Removed corner pole to ourdoor room - $5k Stacker doors - No prices yet since they are not the sizes we want. 2700mm Ground Floor - $10k 2550mm Top Floor - $2.5k Various extra bulk heads - $2k Top Floor changes to rooms, WIRs, bathroom, toilet locations - $3.5k Power room instead of WIL - $1.8k Delete Bath and have big shower instead - Free Top floor toilet added vanity cuboards and sink - $1.2k Front pivot door - $3k (not the correct height yet) Then there was also a lot of little changes made to various windows, height of doors, added cavity doors, sink to butler pantry, storage under stairs, increased kitchen island etc. Things still to be changed from plan above Stacker door from family room to be increased in length Stacker door to dinning room instead of the 2 windows Fixed single glass window to family room Larger Outdoor Room Remove door and void from WIP Height of Pivot door to be increased Width of bulk heads not right in family and sitting rooms Your home is going to be stunning, all the best with your journey! J My Phoenix by Metricon in Melbourne viewtopic.php?f=31&t=83584&p=1570829&hilit=my+phoenix+by+metricon+in+melbourne#p1570829 Re: Metricon Liberty - Hampshire 45 QLD 3Jul 23, 2016 5:18 pm Your WIR is going to be massive!!! Total WIR envy right now Welcome to our new Metricon Henderson viewtopic.php?f=31&t=81978 https://metriconhenderson.wordpress.com Re: Metricon Liberty - Hampshire 45 QLD 4Jul 23, 2016 5:59 pm Thanks J M and T, I hope we don't regret it with the WIR. Total over kill, but neither the misses or I wanted to keep the study that was in the original plans. Only time will tell lol. Re: Metricon Liberty - Hampshire 45 QLD 5Jul 23, 2016 6:08 pm dulie Thanks J M and T, I hope we don't regret it with the WIR. Total over kill, but neither the misses or I wanted to keep the study that was in the original plans. Only time will tell lol. That is one impressive WIR - I am sure you won't regret it...plenty of room in your house so worth spoiling yourselves with the master & robe. It will be your dream home, after all:-) My Phoenix by Metricon in Melbourne viewtopic.php?f=31&t=83584&p=1570829&hilit=my+phoenix+by+metricon+in+melbourne#p1570829 Re: Metricon Liberty - Hampshire 45 QLD 6Jul 23, 2016 8:59 pm dulie Thanks J M and T, I hope we don't regret it with the WIR. Total over kill, but neither the misses or I wanted to keep the study that was in the original plans. Only time will tell lol. It's not overkill! Think of all the options... Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Welcome to our new Metricon Henderson viewtopic.php?f=31&t=81978 https://metriconhenderson.wordpress.com Re: Metricon Liberty - Hampshire 45 QLD 7Jul 24, 2016 3:46 pm Looks awesome Dulie, remember to consider rebating stacker doors into the slab if that's what you want What fascade are you going with? Metricon Liberty 45 in Ryde NSW viewtopic.php?t=82846 Build thread: Metricon Liberty 45 in Ryde, NSW Re: Metricon Liberty - Hampshire 45 QLD 8Jul 24, 2016 5:12 pm M and T dulie Thanks J M and T, I hope we don't regret it with the WIR. Total over kill, but neither the misses or I wanted to keep the study that was in the original plans. Only time will tell lol. It's not overkill! Think of all the options... Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Welcome to our new Metricon Henderson viewtopic.php?f=31&t=81978 https://metriconhenderson.wordpress.com Total WIR envy right now especially with these pictures GJ Gardner Modified Coolum 277 viewtopic.php?t=83643 Re: Metricon Liberty - Hampshire 45 QLD 9Jul 24, 2016 6:52 pm Awesome looking home Dulie viewtopic.php?f=31&t=83489 Re: Metricon Liberty - Hampshire 45 QLD 10Jul 25, 2016 3:05 pm Thanks for the love guys. The WIR from the Phoenix is the inspiration we used. Hopefully we'll get something long them lines.... Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Quirmeball1280 Looks awesome Dulie, remember to consider rebating stacker doors into the slab if that's what you want What fascade are you going with? Yup, I've hassled the SC a few times about it. It better turn up in the next revision of the plans or I'm gonna be super annoyed! As for fascade, we are going with the Alessi Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Metricon Liberty - Hampshire 45 QLD 12Aug 01, 2016 1:59 pm Great floor plan Dulie. Love the facade too. We're just about to start doing a Liberty 42 - the layout is very similar. Look forward to following your progress. Re: Metricon Liberty - Hampshire 45 QLD 13Aug 01, 2016 3:28 pm Thanks guys.
Forgot to mention it's a KDR. Metricon reckons I need to knock it down by the end of this month or early next. They reckon I won't make the deadlines for council approvals etc if I don't. I just feel bad for the great tenants that I've had there over the pass year. Oh wells, they knew it was only a matter of time. Pic of the old. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: KDR Metricon Liberty - Hampshire 45 QLD 14Aug 01, 2016 4:59 pm We're doing KDR too in Sydney. Not sure if it's different here. We had to get our Demo approval and Building approval from council before we could start demolition. Re: KDR Metricon Liberty - Hampshire 45 QLD 15Aug 01, 2016 10:38 pm project.forty4 We're doing KDR too in Sydney. Not sure if it's different here. We had to get our Demo approval and Building approval from council before we could start demolition. No idea. I'm going to try and get lodge for a Demo Approval tomorrow. I'm just going with the flow, the guys at Metricon just told me it needs to be done lol. Re: KDR Metricon Liberty - Hampshire 45 QLD 16Aug 22, 2016 9:57 pm Had my tiles and electricals today... kinda got some super scary prices for the tiles, but eletricals wasn't too bad. I'll share that first. Total for Electrical : $18419 Details broken down below. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: KDR Metricon Liberty - Hampshire 45 QLD 17Aug 22, 2016 10:11 pm Total for titles: $32056 Didn't really do anything fancy. I picked 3 colours all polished 600x600 Porcelain. And Hexagon thingys for either side of the window splash back. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ The costly bit was full height tiling to ceilings in the all the bathrooms. Break down below. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: KDR Metricon Liberty - Hampshire 45 QLD 18Aug 22, 2016 10:57 pm Can you do a rough check that they've calculated it correctly? Metricon double charged us in our initial quote. I made sure I double checked everything and when I calculated the tile cost and the sqm I picked it up the extra $$. Re: KDR Metricon Liberty - Hampshire 45 QLD 19Aug 22, 2016 11:10 pm Nar haven't done that yet. It's been a long day, probably have a crack it it soon. Re: KDR Metricon Liberty - Hampshire 45 QLD 20Aug 22, 2016 11:14 pm Yep - tiles and electricals are a killer!! I was wrecked after ours. We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 36885 The biggest challenge will be if you take out a loan and then run out of money - you'll have an incomplete security and lenders do not like this so you can get stuck.… 2 18884 Hi, I am looking into doing a KDR in Melbourne and am contemplating using Kialla Homes. I am looking for feedback on them from others who have built with them. 0 13298 |