Good luck with NHP.
The sheet above the garage door looks good painted that colour, blends in nicely!
Browse Forums Building A New House Re: MainVue Emporio ER432 Ultima 388Apr 05, 2016 3:23 pm My Build Journey - Mainvue Amalfi 530 in South Eastern Melbourne https://forum.homeone.com.au/viewtopic.php?f=31&t=75810&p=1353804&hilit=mainvue+amalfi#p1353804 Re: MainVue Emporio ER432 Ultima 390Apr 05, 2016 3:51 pm My Build Journey - Mainvue Amalfi 530 in South Eastern Melbourne https://forum.homeone.com.au/viewtopic.php?f=31&t=75810&p=1353804&hilit=mainvue+amalfi#p1353804 Re: MainVue Emporio ER432 Ultima 393Apr 05, 2016 9:27 pm ------------------------------------------- Build Thread - Mainvue Emporio ER430 KDR https://forum.homeone.com.au/viewtopic.php?f=31&t=76790&p=1332227&hilit=mainvue#p1332227 Re: MainVue Emporio ER432 Ultima 397May 23, 2016 7:39 pm My Build Journey - Mainvue Amalfi 530 in South Eastern Melbourne https://forum.homeone.com.au/viewtopic.php?f=31&t=75810&p=1353804&hilit=mainvue+amalfi#p1353804 Re: MainVue Emporio ER432 Ultima 400Nov 11, 2016 9:12 am kaspa000 Quote: Conifers I have been reading few posts and learnt a lot, so I thought I would start my own too. We are doing a knock down rebuild and hoping for a site start in a couple of weeks. Here is a bit of a timeline so far 21/9/14 Paid 1st deposit 19/11/14 Signed quote. MainVue will now go ahead with soil & site survey 27/11/14 Colour appointment 14/01/15 Tender appointment 16/02/15 Dispo lodged with council for reduced setback 18/03/15 Moved into rental 23/3/15 Applied for gas & electricity to be abolished 08/04/15 Gas abolishment done 08/04/15 Dispo rejected by council. 15/04/15 Found electricity had also been abolished 28/04/15 Received contracts 01/05/15 Temp fence installed in prep for demo 04/05/15 Contracts signed 04/05/15 Demo commenced 06/05/15 Demo finished. (Not a particular good job mind you) 18/05/15 Demo co. Finally came aback to do site scrape and clean 21/05/15 2nd survey done 28/05/15 2nd soil test 09/06/15 Pool commenced. Dug hole, delivered pool and put in place 10/06/15 Pool filled and set. 11/06/15 Pool finished until after handover. Void cover installed 23/06/15 Building permit approved. 10/07/15 Toilet delivered, site scrape & level. House pegged out 13/07/15 Piers done 16/07/15 Electric cables laid and meter box installed 21/07/15 Plumbing rough in done 24/07/15 Termite caps done 27/07/15 Waffle pods laid out, boxed up ready for concrete 28/07/15 Slab poured 05/08/15 Frame started 26/08/15 Gutters & facia installed 31/08/15 Roof started 01/09/15 roof finished 02/09/15 Heating & air con ducts installed 03/09/15 plumbers rough in internal pipes 04/09/15 goop guy 09/09/15 Blue wrap done on frame 10/09/15 Plaster delivered 11/09/15 Bricks delivered 14/09/15 Meeting with SS to go through inspection report 15/09/15 bath hobs installed and walls straighten in prep for plaster 17/09/15 Sparky on site to start on rough in of wiring. Garage roof trusses installed. Bricky turned up to prep 18/09/15 Bricky started laying bricks 22/09/15 Insulation done. Gutter & facia on garage installed 23/09/15 independent inspection done for pre plaster 28/09/15 Garage roof installed 05/10/15 Scaffolding erected around outside to brick upstairs. Meeting with SS 14/10/15 Plaster hung 16/10/15 Bricks all finished 23/10/15 bricks upper level acid washed 26/10/15 Plaster sanded 28/10/15 Eve's installed 30/10/15 Stairs installed 04/11/15 kitchen cabinets installed, bathroom cabinet delivered. Bathrooms waterproofed. 05/11/15 All cabinetry installed. 06/11/15 skirting and arc's installed and doors hung 09/11/15 Tiles delivered 16/11/15 foam board installed on facade and tiler started 25/11/15 facade base coat render done and painter started prep inside 26/11/15 painting hi, i am installing the same pool as you during my Metricon home build and i was wondering if you have a pool fence do you still need to have the pool void covered. If so how much did it cost to have a cover put on. Sorry for the delay in replying. You probably should check with your builder, as each would be different, I think with ours if the pool was within 3 meters of the house then it had to have the void cover. Our cover was included and done by the guy who installed the pool. But I think they are around $1,000 (although you could do it a lot cheaper, as it was just sheets of tin nailed to timber that was bolted down.) viewtopic.php?t=78112 |