Quick note.
Popped into DA Central on Thursday as we are having issues with our wall tiles.
We were helped by Steph. Just wanted to say that my wife and I have not met a more helpful and professional person. Steph went out of her way in helping us with our questions.
Post subject: Re: Dale Alcock Build in Secret Harbour
Posted: Jul 17, 2012 12:01 pm
Junior Member
Joined: 10 Jun 2012 Posts: 31
Hi Polack,
Early december? that makes me question our handover date. we are at the same stage as you and we were first told about october. but I was thinking more november with some rain delay we have had. but maybe not. Oh well. i guess the longer it takes the more time I have to save.
Post subject: Re: Dale Alcock Build in Secret Harbour
Posted: Jul 17, 2012 12:14 pm
Loyal Member
Joined: 25 May 2012 Posts: 98
Bagheera,
The outdoor bbq area brick work has been finished. Just need to organise the render. I'll take some photo's once the pool is installed next week.
Casanova,
Quote:
Oh well. i guess the longer it takes the more time I have to save.
That's what we are thinking...
With the stacking windows in the kitchen, they won't be started until everything is nearly finished. Then they will measure and get them made which will take approximately 3 weeks. The same with glass splashbacks. This may cause a blow out.
So, we were told early December however I think it maybe just before xmas. If so, I'd rather wait til the new year as I don't fancy organising a move during xmas.
Post subject: Re: Dale Alcock Build in Secret Harbour
Posted: Jul 19, 2012 12:38 pm
Loyal Member
Joined: 25 May 2012 Posts: 98
Thanks marybond 2012...
The bbq will be on the left, two glass door bar fridges will be in the opening in the middle and the pizza oven will be on the right closest the kitchen.
With the pool going in shortly, it's all happening.
It's good to see what we visualised on paper starting to take shape.
The plastering is due to start on the house today.. Also spoke to our SS who gave us a detailed timeline. Apparently things are looking good for a handover in November. Fingers crossed.
Post subject: Re: Dale Alcock Build in Secret Harbour
Posted: Jul 30, 2012 1:59 pm
Gold Member
Joined: 06 Feb 2011 Posts: 1435 Location: Golden Grove, S Aust
What a great, well thought out plan The shower backing into the dressing room is a good idea, utilizing the space really well, love the poppy flat too.
Are you having mains gas to your outdoor BBQ? We had it at our old place but decided to use bottles this time to move the BBQ around but I'm liking your built in one, specially with the pizza oven, will that be wood fired?
Post subject: Re: Dale Alcock Build in Secret Harbour
Posted: Jul 30, 2012 2:29 pm
Loyal Member
Joined: 25 May 2012 Posts: 98
dreamcometrue, thanks for your comments.
The bbq and pizza oven will both run of the mains gas. We had a gas pizza oven previously and liked the flexability in being able to cook the kids pizza's, turn it off and then turn it back on for the adults later. It takes only 5 min's to reach the right temperature and it's easy to control. You can add wood chips to it if you wanted a smokey effect. We never bothered though.
Surprisingly only just found your thread! Your house is looking fantastic!!!
We are also building with DAH - although it hasn't started, we have done pre selection and just about to sign our final contract. Then onto prestart and hopefully not too much longer till we're slabbed!!!
Quick question, how did you go about getting your pool installed prior to handover?? And do you have to pay for boarding/fencing around the pool while the property is still a construction site???