Jun 18, 2013 3:58 pmSign In37 members logged in
homeone® - Australia's home building and renovation resource. home building and renovation
Find ProfessionalsPhotosVideosArticlesExpertsForumAdvertise 
Building Forum » Building, Renovation & Maintenance » Building A New House

Advanced Search

Australia's home building and renovation community providing you with access to the largest building forum and premium directory of trade professionals.
LoginJoinLearn more

View unanswered posts | View active topics


Building Forum » Building, Renovation & Maintenance » Building A New House

Masterton Homes - The new thread 2.0

New Topic Post Reply  Page 122 of 125
 [ 2494 posts ]  Go to page Previous  1 ... 119, 120, 121, 122, 123, 124, 125 Next
  Print view Previous topic | Next topic 
Author Message
Manhattan 37 builder
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 15, 2012 11:10 pm 
Offline
Senior Member
Senior Member

Joined: 20 Jun 2011
Posts: 121
squashedrex - congrats! Your place looks awesome - really open and looks so comfy and relaxing! Makes us all envious as we await our homes to be built!

For those who are waiting for their construction to begin within the 20 day timeframe, I remember my CC telling me that even if they don't physically start within the 20 days, they will make up the time later. The main thing to remember is that your "Construction period" actually starts once the 20 days expires - so it's countdown from there onwards. So technically speaking, they don't HAVE to start in 20 days - that's what I got confirmed for me a few weeks back. So hang in there and try not to get too anxious! Easier said than done, i know, but yeh, try your best :)

Once things start, they are non-stop! We've had something happen on our site every day since the portaloo arrived. Even if no workmen have been on-site, we've either had a delivery of gravel, or some lines marked on the slab, or something one way or another. So it's pretty exciting. I've been updating my blog almost daily (except weekends due to no activity) so you can check it out to see what to expect. Tomorrow the frame is being delivered so that will be the next big thing! Oh not to mention that you get hit with two big progress payments within just a few weeks of each other!

_________________
Deposit: Jul11
Contract: 1/11/11
Colours/Electrical/Sentinel/Aircon: Nov11
CDC: Dec11
File on hold: Dec11-Jun12
Construction: Jul12
Lock-up: 14th Nov

http://hometanamal.blogspot.com.au/


Top
 Profile  
dsa39
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 7:25 am 
Offline
Gold Member
Gold Member
User avatar

Joined: 20 Dec 2009
Posts: 1571
PS_Sirocco7 wrote:
dsa39 - Its all good. Its just another hurdle we need to jump. I just want to get it done quickly so as to not delay or put off the excavator next week.

From memory, we had to sign the validation and updated schedule before we were released to construction. We had Kerstin too. Seems to be different across the board.

Ok so that must be the next step for us because I got sent the electrical variation to sign yesterday that was the only thing outstanding. Did you sign after your 20 days had started?

_________________
viewtopic.php?f=31&t=46741
Clovelly - Masterton Homes

5% to M 290312
CDC 21/06
20 days 29/08
Slab 17/09
Frame 26/09
Bricks 24/10
Roof tiles 20/11


Top
 Profile  
PowerballSam
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 8:11 am 
Offline
Bronze Member
Bronze Member

Joined: 31 Jan 2012
Posts: 157
I think the 20 days start when all paperwork is signed. All variations have to be finlised before the 20 days start.

We are at day 9 of the 20....fun, fun, fun.


Top
 Profile  
PS_Sirocco7
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 8:14 am 
Offline
Gold Member
Gold Member
User avatar

Joined: 02 Feb 2012
Posts: 868
dsa39 - I also had to get everything signed off before the 20 day countdown could start. Sounds like they let you through a little early which is well deserved for you after all the crap you've faced.

_________________
Masterton Sirocco 7
2012-13
30.01-SITE CHECK
29.05-CONTRACTED
28.06-APPROVED
21.08-SCRAPED
13.09-SLABBED
02.10-FRAMED
24.10-BRICKED
28.11-PLASTERED
03.12-LOCK-UP
05.02-PAINTED
21.02-PCI
25.02-KEYS
Blog-Thread


Top
 Profile  
Rinnai79
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 1:23 pm 
Offline
Senior Member
Senior Member

Joined: 28 Feb 2012
Posts: 129
Generally your 20 days starts after all variations are done, as your bank has to approve it with all provisions included, along with your signed plans and what not..

Either way, if you are definitely in your 20 day period, you should see a toilet after about 15 days, along with a fence and trade waste and garbage bin for tradies..

Be prepared for payments to come in thick and fast, given that our build has been ridiculously quick, we've had payments at least every second week, our last 2 payments were in the same week, bricktop finish and lock up... Hoping we dont get another increase for another few weeks at least.. hehe....

But we now have a kitchen installed and the tiler was out yesterday doing our bathrooms and laundry... So it means there isnt too much left for them to do after that... Paint, Clean up, we inspect and then appliances installed and keys handed over... :)


Top
 Profile  
PS_Sirocco7
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 1:42 pm 
Offline
Gold Member
Gold Member
User avatar

Joined: 02 Feb 2012
Posts: 868
Rinnai79 - Good stuff. wheres all the pics though? You need to feed us hungry mastertonians :)

We finally had a start today. We had our sediment control fence and trade waste area installed.
Now I just need to sort the relocating of the services issue out so as to not delay the scrape next week. I suppose we should see our loo and temp fence shortly too.

Im so stoked to see something finally happen, even as small as it is. Its a great feeling especially after the long drawn out construction countdown. Thats been the hardest part, for me anyway.

_________________
Masterton Sirocco 7
2012-13
30.01-SITE CHECK
29.05-CONTRACTED
28.06-APPROVED
21.08-SCRAPED
13.09-SLABBED
02.10-FRAMED
24.10-BRICKED
28.11-PLASTERED
03.12-LOCK-UP
05.02-PAINTED
21.02-PCI
25.02-KEYS
Blog-Thread


Top
 Profile  
dsa39
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 2:01 pm 
Offline
Gold Member
Gold Member
User avatar

Joined: 20 Dec 2009
Posts: 1571
Mmmm thanks guys I'm a little weary still nonetheless the ball is in their court. None of our process has been standard so won't hold my breath

_________________
viewtopic.php?f=31&t=46741
Clovelly - Masterton Homes

5% to M 290312
CDC 21/06
20 days 29/08
Slab 17/09
Frame 26/09
Bricks 24/10
Roof tiles 20/11


Top
 Profile  
Vatche
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 2:05 pm 
Offline
Gold Member
Gold Member
User avatar

Joined: 21 Mar 2012
Posts: 1116
PS_Sirocco7 wrote:
Rinnai79 - Good stuff. wheres all the pics though? You need to feed us hungry mastertonians :)

We finally had a start today. We had our sediment control fence and trade waste area installed.
Now I just need to sort the relocating of the services issue out so as to not delay the scrape next week. I suppose we should see our loo and temp fence shortly too.

Im so stoked to see something finally happen, even as small as it is. Its a great feeling especially after the long drawn out construction countdown. Thats been the hardest part, for me anyway.

Good to see, some movement finally.

But, once construction starts, how will you access your back cabin? What about the container you have sitting there, how would you get it out once the house is built? :::

_________________
Santorini MK2 Contemp Façade
Thread - Blog
MAR Start
JUL Colours
OCT Demo
NOV Constr
JAN Bricks
FEB Roof
MAR Lockup
APR Paint
MAY Plumb+Elect+Floors+PCI
JUN Keys+Landscaping


Top
 Profile  
PS_Sirocco7
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 2:09 pm 
Offline
Gold Member
Gold Member
User avatar

Joined: 02 Feb 2012
Posts: 868
Vatche wrote:
But, once construction starts, how will you access your back cabin? What about the container you have sitting there, how would you get it out once the house is built? :::


We will have a walkway down the side of the fence on the RHS and in between the container and theres a gate at the rear of the container.

Once the house is built Ive got around 7.5 meteres between the house itself and the fence on the right so there should be enough room for the truck to access the container.
I couldnt do it any other way as weve got a lot of furniture and stored stuff in the container. It is literally filled to the top.
Some of the stuff has been stored for around 5 years now. Its going to be fun going through it all when we move across the back yard. I dont think I'll need to hire a removalist this time too :)

_________________
Masterton Sirocco 7
2012-13
30.01-SITE CHECK
29.05-CONTRACTED
28.06-APPROVED
21.08-SCRAPED
13.09-SLABBED
02.10-FRAMED
24.10-BRICKED
28.11-PLASTERED
03.12-LOCK-UP
05.02-PAINTED
21.02-PCI
25.02-KEYS
Blog-Thread


Top
 Profile  
jo&waz
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 2:14 pm 
Offline
Senior Member
Senior Member

Joined: 14 Apr 2011
Posts: 149
Location: West Lindfield, NSW
Hi everyone!

My wife and I are building a Villina 36, in West Lindfield.

Construction phase entered early July or early June depending upon who you speak to within Masterton.

I've got a blog up also for a looksee and would love to hear any comments. Floor plans are up there also.

We're at the frame stage as of this week.

http://new-lindfield-house.blogspot.com.au/

Talk soon!

(amended to Villina 36 from 34) twice the charm!

_________________
Masterton Villina 36 - 2011

Jul-SLAB
Aug-FRAME
Nov-BRICK+ROOF
Dec-INSUL
Jan-GYPROCK
Feb-LOCKUP
Mar-PCI
Apr-KEYS+MOVE
May-Driveway+Landscaping

Blog - http://new-lindfield-house.blogspot.com.au/


Last edited by jo&waz on Aug 17, 2012 3:25 pm, edited 1 time in total.

Top
 Profile  
Rinnai79
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 2:22 pm 
Offline
Senior Member
Senior Member

Joined: 28 Feb 2012
Posts: 129
I know, I am so bad with pics... We are going to sneak a peek tomorrow if we can at the tiling and kitchen, so once I do that I will upload my pics. :)


Top
 Profile  
PS_Sirocco7
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 3:09 pm 
Offline
Gold Member
Gold Member
User avatar

Joined: 02 Feb 2012
Posts: 868
jo&waz - Woohoo, another blog to follow. Welcome to H1. Look forward to watching your build. :)

Rinnai79 - Good stuff. Cant wait to see your house in action.

_________________
Masterton Sirocco 7
2012-13
30.01-SITE CHECK
29.05-CONTRACTED
28.06-APPROVED
21.08-SCRAPED
13.09-SLABBED
02.10-FRAMED
24.10-BRICKED
28.11-PLASTERED
03.12-LOCK-UP
05.02-PAINTED
21.02-PCI
25.02-KEYS
Blog-Thread


Top
 Profile  
KDLEN
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 3:13 pm 
Offline
Senior Member
Senior Member

Joined: 10 Feb 2012
Posts: 130
Hi guys, im just going over my construction plans and noticed that in the kitchen they didnt remove the pantry. The kitchen plan we signed off on at colours did not have a pantry. Which one will M use? Do they need to re do plans or will they use the layout I signed off at colours??

_________________
Villina 36
$3K Fee Paid 10/1/2012
Contract Signed 20/4/2012
Council Approval 18/7/2012
In Construction 13/9/2012


Top
 Profile  
PS_Sirocco7
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 3:25 pm 
Offline
Gold Member
Gold Member
User avatar

Joined: 02 Feb 2012
Posts: 868
They should use the layout you signed off at colours. As we went with the platinum package the kitchen layout is slightly different to that of the standard. We signed a seperate kitchen plan and it still didnt show the platinum kitchen layout on the final construction plans.
To be sure though, Id talk to your CC and SS to make sure of this before they make any mistakes that may delay things for you.

_________________
Masterton Sirocco 7
2012-13
30.01-SITE CHECK
29.05-CONTRACTED
28.06-APPROVED
21.08-SCRAPED
13.09-SLABBED
02.10-FRAMED
24.10-BRICKED
28.11-PLASTERED
03.12-LOCK-UP
05.02-PAINTED
21.02-PCI
25.02-KEYS
Blog-Thread


Top
 Profile  
Vatche
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 4:27 pm 
Offline
Gold Member
Gold Member
User avatar

Joined: 21 Mar 2012
Posts: 1116
Welcome to H1 jo&waz. I'm sure you will gain lots of info from the forum, like everyone else has or did.

We'll follow your blog too. We love blogs and photos of progresses :)

_________________
Santorini MK2 Contemp Façade
Thread - Blog
MAR Start
JUL Colours
OCT Demo
NOV Constr
JAN Bricks
FEB Roof
MAR Lockup
APR Paint
MAY Plumb+Elect+Floors+PCI
JUN Keys+Landscaping


Top
 Profile  
PS_Sirocco7
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 4:40 pm 
Offline
Gold Member
Gold Member
User avatar

Joined: 02 Feb 2012
Posts: 868
Vatche wrote:
We love blogs and photos of progresses :)


Same here. ::computer::

jo&waz - I just finished going through your blog and you have heaps of great pics on there and your house is going to be huge. Thanks for sharing them with us.
::

_________________
Masterton Sirocco 7
2012-13
30.01-SITE CHECK
29.05-CONTRACTED
28.06-APPROVED
21.08-SCRAPED
13.09-SLABBED
02.10-FRAMED
24.10-BRICKED
28.11-PLASTERED
03.12-LOCK-UP
05.02-PAINTED
21.02-PCI
25.02-KEYS
Blog-Thread


Top
 Profile  
jo&waz
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 4:45 pm 
Offline
Senior Member
Senior Member

Joined: 14 Apr 2011
Posts: 149
Location: West Lindfield, NSW
PS_Sirocco7 wrote:
Vatche wrote:
We love blogs and photos of progresses :)


Same here. ::computer::

jo&waz - I just finished going through your blog and you have heaps of great pics on there and your house is going to be huge. Thanks for sharing them with us.
::


Thanks! This site has been great for us, and has eaten many days of web-time, researching the tricks and traps of contracts and building, options and so on - so thanks to all for that.

I'm going to the site daily and taking photos, but am dreading lock-up, as I won't be able to see what's going on without each time asking the SS. And he is fairly hard to reach... ::dizzy::

Anyway, keep an eye on the blog, more to come! I think the roof frame may well have gone up today...

_________________
Masterton Villina 36 - 2011

Jul-SLAB
Aug-FRAME
Nov-BRICK+ROOF
Dec-INSUL
Jan-GYPROCK
Feb-LOCKUP
Mar-PCI
Apr-KEYS+MOVE
May-Driveway+Landscaping

Blog - http://new-lindfield-house.blogspot.com.au/


Top
 Profile  
Vatche
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 5:20 pm 
Offline
Gold Member
Gold Member
User avatar

Joined: 21 Mar 2012
Posts: 1116
Dear jo&waz,

I'm having trouble viewing your blog, as it is one long page with lots of photos (we love), but it just keeps jittering and can't follow it up. Hope you can change the template setting to a nicer manageable pages soon. Sorry to be the one to mention. :P

_________________
Santorini MK2 Contemp Façade
Thread - Blog
MAR Start
JUL Colours
OCT Demo
NOV Constr
JAN Bricks
FEB Roof
MAR Lockup
APR Paint
MAY Plumb+Elect+Floors+PCI
JUN Keys+Landscaping


Top
 Profile  
cem
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 5:42 pm 
Offline
Bronze Member
Bronze Member

Joined: 24 Jan 2011
Posts: 183
A bin for tradies waste??? I thought that was simply the ground anywhere they could throw it - as that was what they did at my site - even had to ask M to make sure they didn't throw their sandwich leftovers etc over the fence into the street or into the neighbours yards.


Top
 Profile  
PS_Sirocco7
 Post subject: Re: Masterton Homes - The new thread 2.0
PostPosted: Aug 16, 2012 6:24 pm 
Offline
Gold Member
Gold Member
User avatar

Joined: 02 Feb 2012
Posts: 868
cem - Its not really a bin. Its more like a barrier made of the same stuff the sediment control fence is made from and is open on one side. Its not very tall though so I dont klnow how efficient it will be.

We also had to fork out $220 in out tender to have a garbage receptacle for food scraps etc for the tradies. :roll:

_________________
Masterton Sirocco 7
2012-13
30.01-SITE CHECK
29.05-CONTRACTED
28.06-APPROVED
21.08-SCRAPED
13.09-SLABBED
02.10-FRAMED
24.10-BRICKED
28.11-PLASTERED
03.12-LOCK-UP
05.02-PAINTED
21.02-PCI
25.02-KEYS
Blog-Thread


Top
 Profile  
Sort by  
New Topic Post Reply  Page 122 of 125
 [ 2494 posts ]  Go to page Previous  1 ... 119, 120, 121, 122, 123, 124, 125 Next

Building Forum » Building, Renovation & Maintenance » Building A New House



Who is online

Users browsing this forum: 1rocky, 3munkeys, Alexa [Bot], charlie23, comfortablywacky, Google [Bot], Google Adsense [Bot], gsxman, Jayboy21, jewel18, memphis, Nat84, pinny, WizardofOz and 76 guests



Search for:




Subscribe

Articles

Read Article: Acrylic Textures  by Euro Trend Plastering WAAcrylic Textures
Imagine a high quality wall coating that exceeds all other …
Read Article: Paterson display home now open in Byford by Celebration Homes WAPaterson display home now open in Byford
Celebration Homes' have recently opened The Paterson, a new display home…
Read Article: 'Gilmore' display home now open in South Yunderup
Celebration Homes invites homebuyers to visit their latest display home the…
Read Article: Doing the Renovation Limbo by The Building Planners QLDDoing the Renovation Limbo
Why we seem to fall into the trap of having an…
Read Article: Interior Design Gets Set for Winter by Dale Alcock Homes WAInterior Design Gets Set for Winter
As the winter chill sets in, we thought now would be…

Videos

Watch Video: Dennis Family Homes - Stephen and Kath Flowers Testimonial Video  by Dennis Family Homes VICDennis Family Homes - Stephen and Kath Flowers Testimonial Video
View why Stephen and Kath have built four times with Dennis…
Watch Video: Kidman display home by Celebration Homes WAKidman display home
A delightful family home with a design dedicated to spacious indoor…
Watch Video: Gilmore display home by Celebration Homes WAGilmore display home
A comfortable family home, The Gilmore features spacious open plan living…
homeone® - Australia's home building and renovation resource.  home building and renovation forum
Jump to: 


All posts made to these forums express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
Forum FAQ | Members | Forum Terms of Use | Site Terms of Use | Privacy

homeone.com.au logos, designs, layout, page headers and colour scheme are ® Copyright Homeone Australia & New Zealand 2001-2013 (v3.0)
homeone® is a registered trademark. All rights reserved. ABN 46 625 367 703.