Hi all,
I'm building with Henley in Allura estate (VIC). Colour appointment has been booked for 31 Jan.
However, I'm so confused about the NBN fibre optic installation because I'm so noob about this stuff.
I took the NBN Fibre optic bronze pack from Henley which includes (wondering if this is all there is to it):
- Conduit
- Earthing of ONT & lead in cables
- Double power point for PSU
- Hub enclosure
- 2 No. telephone points
- 2 No. TV points
Can anyone please explain to me how this works?
If I go with the above package, when the house is built, is it gonna be ready for the service provider (eg telstra) to connect a phone line and internet?
Also, the builder standard inclusion already has 2 TV points, why would the NBN package include another 2 TV points? Are NBN TV points different from the standard TV points?
I'm thinking that the standard TV points will connect to TV antenna while NBN TV points will connect to other source (such as foxtel) if I pay for the service. *not sure if this is correct*
At Henley, I heard there is a move-in package which include TV antenna installation, does anyone have this move-in package? Or is it easy for me to install the TV antenna later on?
Help much appreciated... Thanks.
mtz