sezza
the tilers were there starting yesterday. and they will be working over the break.
Browse Forums Building A New House Re: Sezza's Build SOR Perth. PICS!!!!! 261Dec 22, 2010 10:37 pm sezza the tilers were there starting yesterday. and they will be working over the break. Built with Sw1tch H0mes >Build thread< House status 15/12: Gates and A/C finally installed! Sep 09 Bought block, Dec 09 Engaged builder, Jul '11 Moved in Re: Sezza's Build SOR Perth. PICS!!!!! 262Dec 22, 2010 11:34 pm Wow they've certainly done a lot on your build since you went to lockup, if they keep this pace up you'll have keys before you know it. Re: Sezza's Build SOR Perth. PICS!!!!! 264Dec 23, 2010 9:23 am zircon Wow they've certainly done a lot on your build since you went to lockup, if they keep this pace up you'll have keys before you know it. SS mentioned towards the end of feb for PC1. never know it may be sooner. we are renting at the moment and we are actually quite lucky as we are on a periodic lease and only need to give 4 weeks notice. worked out really well. we built our last house. and the neighbours built at the same time too. friends with them. they moved out and rented their house out the yr before and those tenants moved out just when we needed a place to live after we sold our house. so only had to move next door and the next move is only like 5mins away. SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Build SOR Perth. PICS!!!!! 265Dec 23, 2010 9:43 am Your house is looking fantastic. Love the spa and vanities. contract signed: Nov 09 Released to Construction: 23 Jul 10 Slab poured: 9 Aug 10 Frame completed: 30 Aug 10 Windows & Gutters: 7 Sep 10 Bricks: 15 - 23 Sep 10 Roof: 24 Sep 10 Gyprock: 20 Oct 10 Lockup: 25 Oct 10 Kitchen: 27 Oct 10 Tiling: 6 - 9 Nov 10 Painting: 17 Nov 10 Carpet: 30 Nov 10 PCI: 15 Dec 10 Handover: 17 Dec 10 https://forum.homeone.com.au/viewtopic.php?f=31&t=35943 Re: Sezza's Build SOR Perth. PICS!!!!! 266Jan 06, 2011 9:38 am Hope everyone has had a lovely Christmas and a great start to the New Year. 2011.. the year of moving into our houses!!! Not alot has happened over the last couple of weeks. so much for the tilers working over the break. they prob just said that to get the job?!?!?!?! painter has been there a couple of times just plodding along. he cant do all of his work yet as the carpenter needs to come in. this is the fun part of the build. watching all those finishing touches come together. really gunna have to get cracking with quotes for carpet, tiles, blinds. gunna run outta time before i know it. hoping feb/march when house may be finished isnt too hot - hoping to hold off on air con for a lil while just so we can get other stuff done 1st. partner was wanting to get a painter in... but i think i might up up doing it - save some mulah!!! will see what happens SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Build SOR Perth. PICS!!!!! 267Jan 08, 2011 12:41 am the render has been painted............. not sure bout the colour at all - def has pinkish tones?!?!?!?!?! picked out some carpet today aswell.put down a deposit. one thing on the list of many to get organised. more pics to come up soon. SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Build SOR Perth. render painted. 268Jan 08, 2011 12:46 am Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ think i'm gunna be having nightmares about render tonight. will see how it looks once the door is painted the colour it should be. post are gunna be in the same colour as the main render. gutters and fascia are in monument. well for the moment anyways. who knows, once we move in i may be repainting. the back of the gables will be in a jarrah look finish to match the roller door. thinking we should have also done the wood plank at the front in a jarrah look as well. just hope the carpet we picked today is gunna be the right colour aswell. SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Build SOR Perth. PICS!!!!! 269Jan 08, 2011 1:44 pm sezza Not alot has happened over the last couple of weeks. so much for the tilers working over the break. they prob just said that to get the job?!?!?!?! painter has been there a couple of times just plodding along. he cant do all of his work yet as the carpenter needs to come in. this is the fun part of the build. watching all those finishing touches come together. sezza really gunna have to get cracking with quotes for carpet, tiles, blinds. gunna run outta time before i know it. hoping feb/march when house may be finished isnt too hot - hoping to hold off on air con for a lil while just so we can get other stuff done 1st. partner was wanting to get a painter in... but i think i might up up doing it - save some mulah!!! will see what happens Built with Sw1tch H0mes >Build thread< House status 15/12: Gates and A/C finally installed! Sep 09 Bought block, Dec 09 Engaged builder, Jul '11 Moved in Re: Sezza's Build SOR Perth. render painted. 270Jan 08, 2011 3:51 pm Hey Sezza, I think your front render doesn't look 'too pinkish' at all - actually I think it goes really well with your roof colour Does it look different at different times of the day when the sun is directly on it? From what I can see in these pics the sun is coming in from behind so maybe casting a bit more of a shadow...? I too am having nightmares about our front render colour - and they haven't even got around to painting it yet!!! We thought we'd go the safe route and get them to use the same colours as one of their display homes, but now that I've seen sample chips of the colours we chose, I don't think they're the same colours at all. Seriously having second thoughts Re: Sezza's Build SOR Perth. render painted. 271Jan 08, 2011 7:47 pm Westy – wait to see the entire house finished as it can be deceiving with so many unfinished bits around. Lis - it’s very hard to visualise from small colour chips – had the same problem – went with one of their display home colours, had a look at their addenda and the colour samples and thought they are wrong but they were right – paint colour behaves different in the sun light... Preliminary agreement 23/11 Contract 22/03 Prestart 06/04 - finalised on 30/04 Unconditional approval 10/05 Demolition 05/07 Slab 26/08 Brickwork 13/09-06/10 Roof frame started 07/10 viewtopic.php?f=31&t=32292 Re: Sezza's Build SOR Perth. render painted. 272Jan 11, 2011 8:40 pm i'm soooo happy at the moment. my partner spoke to the painter today and we are going to get him to repaint the render and front door. (luckily the door is still in its lovely shade of green colour!!!) just gotta get the colour right this time. really wasnt happy with it. sent my CLO an email asking colours from display homes. tilers have started in the main bathroom. still waiting on the carpenter to do his bit. think he must be on hols still. SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Build SOR Perth. render gunna get REpainted :) 273Jan 12, 2011 9:43 am the colours i have in mind are - Dulux Grand Piano and Dulux String. Like the Grand Karri display home. http://www.scottparkhomes.com.au/metro/ ... and-karri/ and also Dulux Linseed and Taubmans Lapstone. Like the Grand Avalon display. http://www.scottparkhomes.com.au/metro/ ... nd-avalon/ Going to head to these display homes on my day off to check out the render colours. Think these will go much better than what we have now and match in with our dark roof and gutters and also the jarrah look garage door. I figure they pay colour consultants to get the colours right on display homes so its a safer option to go woth something like that SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Build SOR Perth. render gunna get REpainted :) 274Jan 13, 2011 9:39 am tilers have been progreesing well. went down last night while the sun was still shining a lil. the floor tiles in the bathrooms, vanity area nad laundry are down. and the kitchen splashback tiles were up. love them!!!! really cant wait to start using my kitchen and all that cupboard space i have in there. has anyone else noticed that their draws in the kitchen are quite narrow - i was in our display home lst sunday and the draws are differant sizes. i know sometimes in display homes they can do things a lil differant to the exact plans. another amendment (abouth the 6th) to our addenda - i picked it up this time. linen cupboard in the entry way we wanted like the display home shelf and rail on one side and 4 shelves on the other. on our plan they had 4 selves on one side and 7 on the other. luckily the carpenter hasnt even started yet. SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Build SOR Perth. render gunna get REpainted :) 275Jan 13, 2011 7:07 pm Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Build SOR Perth. tiling underway.. PICS!!! 276Jan 15, 2011 1:24 pm You really moving fast now Sezza. So much change from the last time I was on your thread. Welcome to the render nightmare club I couldn't sleep for a week after I've seen my render painted. Still freaks me out whenever I go there. Can't wait to repaint it. Which one did you choose? Grand Karri or Avalon? I like Karri better but I think it's a bit light and will get dirty faster? Do houses get dirty? contract 10/11 prestart 04/10 slab 06/10 bricks 07/10 roof 09/10 plaster 10/10 Ceiling 10/10 LOCKUP 10/10 tiling wet areas 11/10 garage floor 11/10 PCI 12.01.11 handover 11.02.11 https://forum.homeone.com.au/viewtopic.php?f=31&t=39361&hilit=malvern+springs We are in !!! Re: Sezza's Build SOR Perth. tiling underway.. PICS!!! 277Jan 15, 2011 8:25 pm went to solver yesterday and now i'm thinking of Kanga???? even got myself a free sample pot!!!!! was quite happy with that. i'm just sooo happy that the painter is willing to do a cashie and repaint it. i was abit iffy bout the colour we first picked from the start. sounds weird but.. theres a few really nice rendered fronts of houses on newish houses just near here... might even know on their doors and find out what colours they are. partner saw the Grand Karri the other day... dont think its quite the colour we after. will get there. SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Build SOR Perth. tiling underway.. PICS!!! 278Jan 16, 2011 12:42 am Hi sezza, Your place is coming along nicely I did a quick search for "kanga" colour & found this thread with a picture of part render painted in that colour...might give you a better idea of finished colour; viewtopic.php?f=31&t=23112&start=120 Soooo hard choosing render colours, i don't think people would mind you asking what they used on their homes Cooper's Build - Perth NOR viewtopic.php?f=31&t=30525 Prelim- mid Sept 2009, Pre Start 2 Feb, Siteworks- 21 April 2010, Slab- 10 May, Deliveries- all by 26 May Bricking- 28 May - 26 June, Roof complete 5 Aug, Float 28 Aug, Lock up 16 Sept Cabinets 1 Oct, Tiling 22 Oct, PCI 18 Nov, KEYS 3 Dec 2010 MOVED IN 17 DEC 2010 Re: Sezza's Build SOR Perth. tiling underway.. PICS!!! 279Jan 16, 2011 9:48 am thanks cooper... i nearly had a heart attack when i saw the first pic!!!! i was like noooooooooooo. no pinky!!!! but the corrected colour looks good. hmmmmm.... soooooooooo hard, i really wanna get the colour right. think i'll hit some display homes and knock on strangers doors. SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Build SOR Perth. tiling underway.. PICS!!! 280Jan 16, 2011 4:29 pm Felt excatly the same Sezza - I saw the first picture and thought Cooper is having bad day. Like the other however I want soemthing more dark - charcoal shade. Can the garage door be repainted too - they powder coated contract 10/11 prestart 04/10 slab 06/10 bricks 07/10 roof 09/10 plaster 10/10 Ceiling 10/10 LOCKUP 10/10 tiling wet areas 11/10 garage floor 11/10 PCI 12.01.11 handover 11.02.11 https://forum.homeone.com.au/viewtopic.php?f=31&t=39361&hilit=malvern+springs We are in !!! Thank you so much everyone. This all makes a lot of sense. I guess when you talk to a builder who butters up everything to look very polished, you get to start believing… 7 17858 1 11055 1 4722 |