Browse Forums Building A New House Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 21Jun 23, 2010 8:59 am Hi Sezza, Great choice in tiles etc Look foreward to see how you go (another Baldivs builder) My building thread viewtopic.php?f=1&t=25279 NEARLY DONE. KEYS ON 5/11 AT 1PM Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 22Jun 23, 2010 9:20 am Your plan looks great. LOVE the ensuite. contract signed: Nov 09 Released to Construction: 23 Jul 10 Slab poured: 9 Aug 10 Frame completed: 30 Aug 10 Windows & Gutters: 7 Sep 10 Bricks: 15 - 23 Sep 10 Roof: 24 Sep 10 Gyprock: 20 Oct 10 Lockup: 25 Oct 10 Kitchen: 27 Oct 10 Tiling: 6 - 9 Nov 10 Painting: 17 Nov 10 Carpet: 30 Nov 10 PCI: 15 Dec 10 Handover: 17 Dec 10 https://forum.homeone.com.au/viewtopic.php?f=31&t=35943 Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 23Jun 23, 2010 2:24 pm Like those tiles.... Deemaree Kyndylan Capers: viewtopic.php?f=36&t=46852 My blog: http://www.sufficientlysufficient.blogspot.com/ Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 24Jun 29, 2010 12:34 am went out to the display home on the weekend. love going there, could just live there... i guess you know its the right house plan when it fells like this. just waiting on some final paperwork from the bank and hopefully a slab wont be too far away. SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 25Jun 29, 2010 6:43 pm Have you spoken to SP about when work is likely to start? We know some people who recently got told work wouldn't be starting on their site for three months. Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 26Jun 29, 2010 10:29 pm theres a lil hold up for us with the bank.. waiting for an evaluation or something. hopefully that will get sorted soon. wow.... 3 mths til something happens... wonder why such a delay???? i just know it will be worth it in the end... SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 27Jul 02, 2010 12:12 am my partner was down at our block today and he said most of the blocks around us are having work started and slabs down... i'm jealous. hoping our lil hold up will soon be sorted and that we get to see something soon. SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 28Jul 02, 2010 12:16 am Ensuite , that is all.. Good Job. Timeline Aug 08-Land Mar 09-Demo/Titles Sept 10-Handover No1 Sept 11-Handover No2 April 12-Sold No2 Aug 14-Land/Demo Jan 15-Slabs viewtopic.php?f=31&t=25736 Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 29Jul 04, 2010 1:08 pm Hey, Love the tile choice, looks great! What estate you building in? I'm in Evermore Heights Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 31Jul 04, 2010 1:36 pm karratha Hey, Love the tile choice, looks great! What estate you building in? I'm in Evermore Heights we are builing in The Chase. Baldivis is getting massive now!!!! sooo many lil estates everywhere. SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's House 2010 (SPH Perth WA) final plans came today 32Jul 04, 2010 1:47 pm in the bathroom we are using that feature tile as a strip down the middle of the shower. we have choosen above counter basins and standing flick mixer tapware and have also used it as a strip feature below the mirror. really cant wait to see how the tiling ends up... cost us a lot extra for it. we also have a feature tile (silver square mosiac) in the kitchen, running through the splashback. dont have a sample tile. chose our tiles from europen ceramics this time. Last house we built in 2006 we used crosby's. SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 33Jul 05, 2010 4:48 pm sezza karratha Hey, Love the tile choice, looks great! What estate you building in? I'm in Evermore Heights we are builing in The Chase. Baldivis is getting massive now!!!! sooo many lil estates everywhere. Yeah it's amazing how it's grown in the last few years. I remember being down there 5-6 years ago and it was only settlers hill and farms everywhere!! Wouldn't know that today Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 34Jul 06, 2010 8:08 pm whoo hoo.. just had news today from the bank. Bring on the construction phase.. hopefully wont have to wait to long for a slab!!! SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 35Jul 06, 2010 8:11 pm Deemaree Kyndylan Capers: viewtopic.php?f=36&t=46852 My blog: http://www.sufficientlysufficient.blogspot.com/ Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 36Jul 09, 2010 11:02 am sezza whoo hoo.. just had news today from the bank. Bring on the construction phase.. hopefully wont have to wait to long for a slab!!! Have your plans been submitted to council yet ? and have they been approved ? that could hold you up, but if the bank is all sorted thats a major hurdle out of the way Built the Grand Karri with SPH viewtopic.php?f=31&t=32958&p=463360#p463360 Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 37Jul 10, 2010 12:42 am ok.. so today we got some mail in the letterbox.. both docs from scott park and the bank!!!!! whoo hoo... so now our file is in scheduling. and they estimate approx 4-6 weeks before construction phase.... we will get there eventually!!!! and is gunna be worth the wait. feels like prestart was ages ago. i am hoping by the time our slab goes down all this rainy weather has gone!!!! SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 38Jul 10, 2010 5:41 pm Great news Sezza! We have taken 9 months from contract to start, but the time has flown (so it seems now!) Deemaree Kyndylan Capers: viewtopic.php?f=36&t=46852 My blog: http://www.sufficientlysufficient.blogspot.com/ Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 39Jul 11, 2010 3:36 pm Some of our colour selections: For exterior: Face brick - Austral Cervantes Roof - Bristile Aniseed in Marseille profile Gutters and Fasia - Colourbond Monument Driveway Paving - Autral Bricks, Koolan with Taylor insert border Front entry door - Solver Flintstone Front Render - Solver Pewter (not 100% sure on the colour we have picked for the render..will see how it turns out - hoping it doesnt look pink!!) SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's House 2010 Baldivis (SPH WA) waiting for somethi 40Jul 16, 2010 11:16 am still lovin that ensuite! Thank you so much everyone. This all makes a lot of sense. I guess when you talk to a builder who butters up everything to look very polished, you get to start believing… 7 19360 1 4960 1 2800 |