Hi Everyone,
So we have signed our contract and have paid 5% deposit. The contract includes a swimming pool and prime cost for cabinetry kitchen and laundry.
I’m not a big fan of the cabinetry from the builder and would like to get our own contractor to build the kitchen and laundry. So pretty much remove the prime cost and pay the contractor ourselves. Builder is open to proceed with owner supplied kitchen if it align a with schedule.
Should i get this added to my contract?
My builder has asked me if I wanted to change from plungie pool to custom concrete pool. I’ve asked multiple time for the swimming pool contractor details but our builder won’t tell me who it is. I want to review the contractor and check their reviews online. As I want someone that has reputable reviews and good reccommodations . I want to ask to remove the swimming pool component if the builder won’t tell me the details.
Will I be charged for variations for these removals?
Thanks in advance