List of issues that might cause delays:
- Bed1 - The sashes to the window in this room are binding on the stiles.
Not sure how they’ll fix this. Possibly they’ll have to replace the whole window. - Ensuite - The fixed pane of glass to the window is scratched.
- Lounge - The metal angle wall brace to the left hand wall has been cut for the installation of the air return grille thereby rendering its installation useless.
They’ll probably have to remove the plaster, re-install a new wall brace and then re-locate the air return grille. - Kitchen - The angled sink cupboard and the cupboards to each side have not been installed into their correct positions which are now running significantly out of parallel with the with the floor tile joints and the front face panels.
This means that the kitchen island bench has been incorrectly installed because it’s not in symmetry. They’ll now have to move the whole bench, redo the plumbing, redo the tiles around it and possibly install a new bench-top
Some other items that I picked up:
- Plumbing under the sinks in ensuite is leaking
- Many tiles had scratch marks which will need to be replaced.
- Slider door-stopper is rubbing against the door frame when the door slides. This has dented the door frame.
But on a brighter note, the new bi-folds have been installed..