May 26, 2013 1:36 pmSign In28 members logged in
homeone® - Australia's home building and renovation resource. home building and renovation
Find ProfessionalsPhotosVideosArticlesExpertsForumAdvertise 
Building Forum » Building, Renovation & Maintenance » General Discussion

Advanced Search

Australia's home building and renovation community providing you with access to the largest building forum and premium directory of trade professionals.
LoginJoinLearn more

View unanswered posts | View active topics


Building Forum » Building, Renovation & Maintenance » General Discussion

Henley - Tender Update

New Topic Post Reply  Page 1 of 1
 [ 3 posts ] 
  Print view Previous topic | Next topic 
Author Message
Ilias
 Post subject: Henley - Tender Update
PostPosted: Mar 21, 2012 4:04 pm 
Offline
Junior Member
Junior Member

Joined: 11 May 2011
Posts: 31
The tender appointment was one of the most horrendous experiences ever had. When we initially signed up with the sales consultant at Mernda they assured us that we would have no problems building the pool shell before commencement of the home, providing the pool was two or more meters away from the building/slab. Anyway, they do not allow us to build the pool unless they cover it by an engineered designed cover. We don't have an issue with that, but we can only do it through Henley and to do this they are charging in excess of $7000. What a load of hogwash!!! Our only option is to add it to the tender or build the pool after handover. We were later advised by the pool company that access would be an issue and the costs would be a lot more. We are no longer building our dream pool.



A further $4000 was added to our tender for a retaining wall that Henley decided needed to be there. Our total site costs are now in excess of $50K. Most of these costs are provisional as the house is still standing and has not been demolished. The additional costs are for spotters due to the power lines being on our side of the road, traffic management (for a street that has no more than 10 or 20 cars driving past it each day) and OHS. We have no more than 1.2 metres of fall on our block. They are so exorbitant when they charge site costs for a knockdown.



Henley were not flexible with a request to change the facade a little. We also showed them pictures that we took of other Henley facades that were changed quite significantly. They did not budge.



Some costs that were quoted by the sales consultant were incorrect and doubled at the tender appointment. At our colour appointment we were quoted $70 to upgrade each mixer. At tender this later changed to $220 per mixer.



A standard option to increase the meals by 1 meter in length and the TV room above on the 1st floor by 1 meter costs $3921. Because we chose to increase the bedroom instead of the TV room, Henley found it acceptable to charge an additional $3000 on top of the $3921. We questioned why and the response was that it was not a standard tick box option. More hogwash I guess.



Anyway, the moral to my story today is; GET EVERYTHING IN WRITING WHEN VISITING THE SALES OFFICE. If we had items or wish lists approved by the sales consultant and her manager in writing, then we would be saving lots of money and still have our lovely pool.



We were so disheartened that we asked for our tender to be rescheduled. We needed the time to revisit the items and add and delete as necessary.

http://buildingwithhenley.blogspot.com.au/

Cheers


Top
 Profile  
luckygrizzly
 Post subject: Re: Henley - Tender Update
PostPosted: Mar 21, 2012 6:52 pm 
Offline
Loyal Member
Loyal Member

Joined: 09 Apr 2009
Posts: 55
Welcome to building with a volume builder...
Cheaper price = compromise... something we also discovered at our tender appointment.
We didn't get our dream home, we got their home with some expensive permitted changes which is the biggest compromise we all have to make going with a big builder.
Go back and see the rep ( preferably when their busy-like a saturday-) and ask why things cost more at the tender than they had indicated. Ask them to estimate the cost again with all the changes you would like to make. Ask around the other builders' displays re their policy with pool construction.. might give you leverage with your builder i.e "builder x has a similar design to ours, but they will only charge us $3000, is the pool cost flexible?" Never know what you can get by asking.
Best of luck and don't lose heart.


Top
 Profile  
humble
 Post subject: Re: Henley - Tender Update
PostPosted: Mar 21, 2012 6:54 pm 
Offline
Gold Member
Gold Member

Joined: 05 May 2011
Posts: 1221
If your unhappy walk away. Simple really. Sounds like you should to be honest.


Top
 Profile  
Sort by  
New Topic Post Reply  Page 1 of 1
 [ 3 posts ] 

Building Forum » Building, Renovation & Maintenance » General Discussion



Who is online

Users browsing this forum: No registered users and 16 guests



Search for:



Subscribe

May 2013 Specials

2 x Espresso Table Lamps4 days leftBy Go Lights NSW
These stunning Espresso table lamps from Cafe Lighting are perfect for the bedroom or the living room. 2 of these lamps for less than $40...read more
10% off for the whole of MAY5 days leftBy SQUAREpeg - Moving Specialists VIC
Since you have the huge decision of choosing who to move with we feel it will make your life easier if we give you 10%...read more
Free Gift for all Homeone Customers5 days leftBy The Round Bath Company WA
Purchase any of our Spas from our huge range on Ebay this month, mention HOMEONE and receive a free gift with your first purchase. To...read more
Winter Rug Clearance Catalogue 11 days leftBy Harvey Norman The Carpet and Flooring Specialists ACT
Save, save, save with modern rugs, traditional rugs, shaggy rugs, wool rugs acrylic rugs and polypropylene rugs! There are many colours and designs to choose...read more
10% off 18 days leftBy PR Painting QLD
Receive up to 105 off your next Brisbane painting quote when you mention this advert...read more

Articles

Read Article: Interior Design Gets Set for Winter by Dale Alcock Homes WAInterior Design Gets Set for Winter
As the winter chill sets in, we thought now would be…
Read Article: FAQFAQ's - Onlinecarpet.com.au
Does OnlineCarpet install? Yes, OnlineCarpet will install your carpet. We are a…
Read Article: Modular Wall Systems wins Industrial Product of the year and Steel Innovation of the year Awards by Modular Wall Systems VICModular Wall Systems wins Industrial Product of the year and Steel Innovation of the year Awards
The industry leading supplier of stylish, cost-effective acoustic & boundary walls…
Read Article: Solar Energy FAQ by Go Lights NSWSolar Energy FAQ
Complete and comprehensive Solar Energy and lighting FAQ
Read Article: Outdoor Lighting Glossary by Go Lights NSWOutdoor Lighting Glossary
A description of the popular types of outdoor lighting

Videos

Watch Video: The Archipelago II by Dale Alcock Homes WAThe Archipelago II
The sequel of our most popular home design, the Archipelago. For…
Watch Video: Timber Pest Inspections by Resicert Property Inspections WATimber Pest Inspections
Resicert Timber Pest Inspections - Brilliant Inspections, Best Reports, Fast!
Watch Video: The Marrakech by Dale Alcock Homes WAThe Marrakech
Built with relaxation and flexibility in mind, the Marrakech means you'll…
homeone® - Australia's home building and renovation resource.  home building and renovation forum
Jump to: 


All posts made to these forums express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
Forum FAQ | Members | Forum Terms of Use | Site Terms of Use | Privacy

homeone.com.au logos, designs, layout, page headers and colour scheme are ® Copyright Homeone Australia & New Zealand 2001-2013 (v3.0)
homeone® is a registered trademark. All rights reserved. ABN 46 625 367 703.