Browse Forums General Discussion Re: Leveling the ground around a building 4Nov 30, 2015 12:38 am Isn't it 75mm below the termite barrier/weep holes, which in my case is level with the top of the slab, which in turn is two course of bricks up. (I have drop edge slab). So should be able to cover the lower course of bricks. Have seen now how the neighbours have done it and might be able to get away with a timber platform/deck that leads to natural ground level with maybe one step one way but the fence side two steps. Will avoid any issues anyway. Re: Leveling the ground around a building 5Nov 30, 2015 8:47 am Quote: Isn't it 75mm below the termite barrier/weep holes, which in my case is level with the top of the slab, which in turn is two course of bricks up. (I have drop edge slab). So should be able to cover the lower course of bricks. Depends on what they have used for a termite barrier as in something like Kordon or a chemical barrier. Don't confuse your DPC with a termite barrier. They are two different things and need to be installed and treated differently. Here's how it should be in relation to your bricks and slab Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ An image from the US but pretty close to how we do it here. Cover up the weepholes and you may give the termites a way in... Stewie Re: Leveling the ground around a building 6Nov 30, 2015 9:26 am They have used a physical barrier which believe also acts as the damp course. Its the orange/red Rentokil product. Way they have done is put the barrier under the frames. They have then laid one row of bricks on the drop edge of the slab, then inserted the barrier (it steps down), then the next row of bricks has the weep holes. So would think I could bring dirt up to the bottom of the lowest course of bricks. That would give 75mm clear space the the barrier and the weep holes. Re: Leveling the ground around a building 7Nov 30, 2015 10:08 am Personally I wouldn't as the 75mm of the visible concrete acts as a solid barrier. Brickwork laid in mortar as you know is prone to have gaps, voids etc. Stewie Re: Leveling the ground around a building 8Dec 08, 2015 11:08 am hi AJW, We have almost the exact scenario at the place we are building although a bit more with a 1051mm drop into the garage. Ideally we wanted to build a retaining wall along that garage edge with steps to break that side into 2 zones. However we were told that there would be moisture related issues which would void our warranty with the builder. Its now left us with a couple of options: 1. We build a deck flush with the laundry but given the slope we would need to extend this for a reasonable distance but it would then leave a void underneath the desk that we are not to comfortable with. 2. We created a tiered setup along that side with steps coming down from the laundry. Not 100% sure how this will look but its the option we are leaning towards at the moment. Lastly we will likely get a landscaper to do a lot of the work so will have someone come in and maybe they have a few different thoughts. Hi everyone, Looking for some advise. We are about to build an above ground pool in our backyard. There is a private sewer line running under the pool at 1.6m… 0 12074 Hi, I'm new to this forum so I hope I'm doing this post correctly. Please advise if it's not. I've just bought my place. The inground pool has a marble lining that has… 0 13827 |